This is a detailed technical report examining Part 2 of the Standard Construction Specifications (SCS) for the Emirate of Abu Dhabi, primarily as issued by the Abu Dhabi Department of Municipalities and Transport (DMT) — historically known as the Department of Municipal Affairs (DMA).
- Download the latest revision from the Abu Dhabi Digital Authority portal.
- Cross-check your material submittals against the "Approved Products List" (APL).
- Train your site QA/QC team specifically on Chapter 200 (Earthworks) and Chapter 500 (Concrete)—the two highest NCR drivers.
- Schedule third-party lab tests according to the frequency matrix (not "as needed").
B. Concrete and Structural Works
This section aligns closely with international codes (British Standards BS/EN or ACI) but modifies them for the Gulf climate. standard construction specifications part 2 abu dhabi
- Dessication Cracking: Prohibits use of desiccated clay for fill.
- Sabkha Treatment: Specific instructions for removing or stabilizing highly saline sabkha soils found along the coast.
- Compaction: Requires 98% MDD (Maximum Dry Density) for subgrade under roads, testing via sand cone or nuclear densometer every 1,000 m².
- Shoring & Trenching: Mandates specific benching and shoring for utility trenches deeper than 1.5 m.
- Search for: “Abu Dhabi DMT Standard Construction Specifications”
- Look for the “Codes & Guidelines” section.
- Download “Volume 2 – Civil Works” or “Part 2 – Earthworks, Pavements & Utilities” (titles vary slightly by edition).
Safety Factors: A minimum safety factor against liquefaction of 1.25 is required. This is a detailed technical report examining Part