Mastering the Press: Good Practices for Jacked Piling in Singapore
If vibrations exceed these, GEOSS requires switching to a slurry wall or pre-drilled pilot hole method before jacking. Mastering the Press: Good Practices for Jacked Piling
Appendix B — Example Trigger Levels (typical, to be project-calibrated) Precast concrete piles: Must be designed for eccentric
| Item | Action | |------|--------| | Ground truth | Review CPT/boreholes for refusal risk | | Design | Set jacking force ≥1.5× working load | | Equipment | Calibrated jacks, inclinometer, continuous logger | | Sequence | Centre-out, stage loading for sensitive clay | | Monitoring | Heave markers, tilt meters on adjacent buildings | | Testing | Static load test on 1% of piles | | Contingency | Pre-boring plan if refusal encountered | to be project-calibrated)
To ensure the quality of the installed foundation piles, the following quality control and assurance measures should be implemented:
who determines the final penetration depth based on actual site conditions. Integrity Testing